The new Long Yi Expressway into the bidding phase to be completed within 3 years-www.ggg138.com

The new Long Yi Expressway into the bidding phase of the year to start the construction of 3 years in the new Hunan client September 17th (reporter Xiao Yanggui) long Yi high-speed every section will block the situation is expected to be resolved. Recently, Changsha to Yiyang G5513 Expressway Expansion Project (hereinafter referred to as the "new Changyi expressway") into the civil engineering project construction bidding stage, it is a nearly parallel to the G5513 Changsha Yiyang Expressway highway, plans to start construction this year, completed in 3 years. According to the Hunan Provincial Expressway Construction and Development Corporation recently issued new Changyi expressway project construction bidding announcement, the new Changyi expressway is located in Changsha Wangcheng District, Ningxiang county and Yiyang city in Heshan District, Changsha Beltway northwest section, Wangcheng District, Ningxiang County Changsha way, Yiyang Heshan District, fountain Jiaohe town so, the docking Yiyang beltway. The new high speed Yima Changyi, together with Ma An, an officer of highway, will form a new channel of Xiangxi area connecting changzhutan. The main line of two-way six lane highway standard construction, a total length of 50.284 km, the design speed of 120 km / h, roadbed width of 33.5 meters. The contents of the building, in addition to road construction, but also relates to 35 main bridges (including the design of main bridge), which bridge has 5, bridge 24, bridge 6, a 815 meter long tunnel, bridge 7, service area 1. The notice requires bidders from September 14th to 21 to the relevant companies to submit the relevant qualification materials on the, before 9:30 on October 13th to submit the tender documents to the relevant units.相关的主题文章: